Tamar Wetlands Bridge Piling

Project Name: Tamar Wetlands Bridge Piling

Client: AJR Construct

Location: Tamar River, Northern Tasmania

Timeline: 2026

Overview: Sub41 were subcontracted to provide the marine assets and piling platform for the shallow water piling operations for Bridge #1 and Bridge #2 in the Tamar Wetlands conservation reserve. Sub41 designed and implemented a ‘spud’ positioning system for the TB Massif Barge allowing it to work in shallow waters of less than 1m. AJR were awesome clients with some really expansive thinking shown. Hopefully we can join forces again in the future.

Next
Next

Bonnie Beach and Deviot Pontoon Replacement